FE2 Hydroelectric Power Station - Credit: Wikimedia Commons
The FE2 Hydroelectric Power Station is a 36 megawatts hydroelectric power station in Gabon. Construction of this dam began in 2010. Due to lack of adequate funding, work was abandoned in 2013. In 2018, after a five-year hiatus, Tebian Electric Apparatus Stock Limited (TBEA), a Chinese independent power producer (IPP), in collaboration with the Gabonese Strategic Investment Fund, indicated their intention to invest €180 million into the development of FE2 HPP. The engineering, procurement and construction (EPC) contract was awarded to the China Gezhouba Group Company (CGGC). The energy off-taker is Société d'Énergie et d'Eau du Gabon (SEEG), the national electricity utility company of Gabon. Read more on Wikipedia
Source: en.wikipedia.org